Pambili Natural Resources Corp

CALGARY, Canada – September 10, 2024 – TheNewswire – Pambili Natural Resources Corporation (“Pambili” or the “Corporation“) (TSX-V: PNN) is pleased to announce that underground drilling has begun at its Golden Valley Mine (“GVM”) in Zimbabwe.

Shengela (Private) Limited (“Shengela”) has been engaged to complete the underground drilling program (Program”) at GVM. An initial 600m of diamond drilling will be completed with the objective of identifying the extension of the orebody previously mined at GVM along with possible parallel zones to the north of the existing orebody. Shengela will use a Meter Eater drilling rig to produce AXT (30 mm) core from up to six holes, with a maximum depth of 100m per hole (Figure 1.).

 


Click Image To View Full Size

Figure 1. Plan of Underground Drilling Holes relative to historic workings at GVM.

  

The Company’s initial objective is to test the down dip continuity of the ore body at GVM through holes EADD001 to EADD003 which will be drilled in a fan at a -45° angle. Pambili expects that at least one of these holes is likely to intersect the orebody in the footwall at approximately 25m downhole.

Pambili’s secondary target is a NW-trending shear that was interpreted from airborne geophysics. The shear appears to be located 25 to 30m north of the underground workings. An initial “scout” hole (EADD004) will be drilled at a +5° angle and, depending on the results obtained from the core, two further holes (EADD005 and EADD006) are planned on either side of the scout hole.

The following schematic shows the location and direction of the planned holes relative to the historic workings at GVM:

 


Click Image To View Full Size

Figure 2. 3D representation of the planned DD holes at GVM relative to the orebody (red), the shear (transparent grey), and the existing mine workings.

Pambili’s drilling program is designed to identify a production resource rather than a code-compliant mineral resource estimate, so sampling and testing will only be conducted on any mineralized zones intersected by each hole. Assays of such intersections will be submitted to an ISO/IEC 17025 accredited commercial metallurgical assay laboratory in Zimbabwe on a hole-by-hole basis to minimize the time taken to get the full assay results.

Pambili expects the assay results from each hole to help guide the direction of subsequent drilling. For example, if the Company’s first hole shows promising mineralization, the direction of the third hole may be adjusted from the initial plan to determine the extent of that mineralization.

 

Jon Harris, Chief Executive Officer of Pambili Natural Resources, commented:

“The gold grades encountered from our sludge drilling holes around the periphery of GVM’s historic development support our belief that, in the absence of geological data, historical mining simply stopped once the mineralized zone was mined out.

Regional geology suggests the Bulawayo greenstone belts exhibit “pinch and swell” structures and Pambili’s drilling program is geared towards identifying the next “swell”. This could have the potential to provide a near-term source of ore to fund operations at Golden Valley.

This will provide the Company with a strong foundation while we look to complete a surface drilling programme at GVM to identify a code-compliant mineral resource.

We’re looking to forward to continuing to advance our understanding of GVM’s gold potential as the drill bit begins turning, and will provide results as and when we are able.”

 

About Pambili Natural Resources Corporation: Pambili Natural Resources Corporation is a natural resources exploration and development company (www.pambilinrc.com) currently active in Zimbabwe and in the province of Alberta.

For further information, contact:

Pambili Natural Resources Corporation

Jon Harris (CEO)

T: 403 277 4421

E: [email protected]

 

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

 

Caution Regarding Forward-Looking Information Forward-looking statements – Certain information set forth in this news release may contain forward-looking statements that involve substantial known and unknown risks and uncertainties. Forward-looking statements are often, but not always, identified by words such as “believes”, “may”, “likely”, “plans”, or similar words. Forward- looking statements included in this news release include statements with respect to work to be done on the Golden Valley mine in Zimbabwe. These forward-looking statements are subject to numerous risks and uncertainties, certain of which are beyond the control of the Corporation, including, but not limited to the impact of general economic conditions, industry conditions, currency fluctuations, and dependence upon regulatory approvals. The Corporation does not assume any obligation to update the forward-looking statements to reflect changes in assumptions or circumstances other than as required by applicable law.

 

[NOT FOR DISTRIBUTION TO U.S. NEWSWIRE OR FOR DISSEMINATION IN THE UNITED STATES]

Copyright (c) 2024 TheNewswire – All rights reserved.